Oil tank stand construction in Crediton
Looking for professional oil tank stand construction help in Crediton? Hembury Contracting provides reliable rural services across Crediton and surrounding areas.
Price Guide
£110-£210
Typical Duration
2-4 hrs
Location
Crediton
Oil tank stand built solid and level at the correct height for gravity feed. Concrete pad or sleeper base construction, positioned properly, meets regulations - your heating oil storage sorted safely.
### Get Your Oil Tank Sorted Properly
An **oil tank stand** needs to be solid, level, and the right height - wonky or low stands mean heating problems, potentially dangerous instability, and Environment Agency headaches. Worth building it right from the start.
> 💡 **Pro tip:** Position tanks where delivery lorries can reach easily and away from buildings/boundaries - saves problems with regulations and makes refilling easier.
---
### Why Proper Construction Matters
A thousand litres of oil weighs a ton. Literally. Stands need to be seriously solid.
| ✅ Built Right | ❌ Bodged | |----------------|-----------| | Level, solid base | Tank tilts, won't drain properly | | Correct height for feed | Air locks, heating failures | | Complies with regulations | Environment Agency issues | | Built for weight | Collapses or sinks over time |
---
### What You Get
**🔧 Professional Construction**
| Stage | What Happens | |-------|--------------| | **Site prep** | Position marked, regulations checked | | **Base construction** | Concrete pad poured or sleeper base built | | **Level check** | Everything checked with spirit level | | **Final prep** | Ready for tank installation (by oil company) |
**📦 Stand Ready** - Solid level base - Correct height for gravity feed - Meets regulations - Built to last decades
---
### Pricing Guide
| Stand Type | Estimated Time | You'll Pay | |------------|----------------|------------| | Simple sleeper base | 2-2.5 hrs | **£110-£135** | | Concrete pad (small tank) | 2.5-3 hrs | **£135-£160** | | Large concrete base | 3-4 hrs | **£160-£210** |
*Based on £60 minimum (first hour) + £50/hr after. Materials (concrete, sleepers, hardcore) charged separately - I'll quote before starting.*
---
### Perfect For Your Property If...
✅ **New oil tank** - needs proper stand built
✅ **Old stand failing** - sinking, rotting, or collapsed
✅ **Regulations compliance** - need proper installation
✅ **Tank replacement** - upgrading to bunded tank
Why Choose Us for Oil tank stand construction in Crediton?
Built level and solid
Right height for gravity feed
Concrete base or sleepers
Complies with regulations
What to Expect
### Step 1: Site Survey I'll check your proposed location, work out correct height for your boiler feed, check regulations (distance from boundaries/buildings), and quote for materials and labour. ### Step 2: Construction Ground prepared, base built (sleepers or concrete depending on your preference and ground conditions), checked for level in all directions. ### Step 3: Completion Final level check, any drainage provisions added, left to cure if concrete. Ready for oil company to install tank.
Our Crediton Service Coverage
We cover Crediton and a 30-mile radius from Exeter, meaning you get local service with the backing of an established business. Whether you're in the centre of Crediton or in the surrounding villages, we're here to help.
Good to Know
> ⚠️ **Regulations matter:** Oil tanks need to be 1.8m from non-fire-rated boundaries, 1.8m from buildings, and away from drains/watercourses. Get this wrong and you'll be rebuilding. Check before you start. **Bunded vs single-skin:** Bunded tanks (double-skin with spill containment) are becoming standard and may be required in sensitive locations. They're heavier - factor that into stand construction. **Tank lifespan:** Steel tanks last 10-15 years typically. Plastic bunded tanks last longer. Budget for eventual replacement - worth building a good stand that outlasts the tank. **Oil delivery access:** Make sure lorries can reach your tank - they need good access to get hoses to fill point. Awkward locations mean surcharges or refusal to deliver. **Drip trays:** Some installations need drip trays underneath tanks to catch minor leaks. Environment Agency may require them in certain locations. **Combined installation:** Some oil companies will build the stand as part of tank installation - worth asking. But many prefer you to provide a ready-made base for them to set the tank on.
Frequently Asked Questions about Oil tank stand construction in Crediton
What height should an oil tank stand be?
Depends on your boiler and where the tank is positioned - typically 2-3ft off ground for gravity feed to work properly. Too low and you get air locks, too high and it's unstable. I'll work out the right height when I see your setup and know where your boiler feed goes.
What regulations apply to oil tank stands?
Building regulations say tanks need stable bases, bund protection in some locations, and correct positioning from boundaries/buildings. Environment Agency has rules about spill containment. I'll advise what's needed for your site when I visit.
Can you build stands for bunded tanks?
Yes - bunded tanks (double-skin) need solid level bases just like single-skin ones. They're heavier when full, so the base needs to be properly constructed. Sleeper bases or concrete pads both work depending on ground conditions.
Do I need planning permission for an oil tank?
Usually not for domestic tanks under 3500 litres, but there are rules about positioning - distance from boundaries, buildings, drains. In conservation areas or listed buildings, you might need permission. I can advise but you're responsible for checking.
How long before I can put the tank on?
Depends on construction - sleeper bases are ready immediately. Concrete bases need 48-72 hours to cure properly before loading with a full tank. Rushing it risks cracking.
Get a Free Quote in Crediton
Call us today for a free, no-obligation quote for your oil tank stand construction job in Crediton.
01392 964094Request Online QuotePricing for Crediton
* Same rates for all locations in our service area
Got multiple jobs?
Make the most of your first hour - I can often tackle several small tasks in one visit. List everything you need done when you call!
Trusted in Crediton
Ready to Book in Crediton?
Get a free quote for your oil tank stand construction job in Crediton today.