Cold frame assembly in Exeter

Professional cold frame assembly services in Exeter and surrounding areas. Local, reliable handyman - no job too small.

Price Guide

£60

Typical Duration

30-60 mins

Location

Exeter, Devon

Professional cold frame assembly - glazing fitted safely, hinges adjusted, and positioned in your garden for the best growing conditions. Ready for seedlings or year-round growing.

Extend Your Growing Season

Cold frames protect seedlings in spring, harden off plants, and keep salads growing through winter. But they need assembling properly, with glazing secure and ventilation working correctly.

🌱 Garden tip: South-facing against a wall is ideal - the wall stores heat and provides wind protection.


Glass vs Polycarbonate

MaterialProsCons
GlassBetter heat retention, clearerFragile, heavier
PolycarbonateLighter, saferCan bow if poorly fitted

Either way, it needs fitting correctly so it doesn't rattle or leak.


What You Get

🔧 Full Setup

StageWhat Happens
CheckGlazing inspected for damage
BuildBase frame assembled first
GlazingPanels fitted securely
HingesLid mechanism adjusted
PositionBest location in your garden

📦 Ideal Positioning

  • South-facing for maximum sun
  • Against south-facing wall (extra warmth)
  • Sheltered from prevailing winds
  • Level, well-drained ground

Pricing Guide

JobEstimated TimeYou'll Pay
Cold frame assembly30-60 mins£60
Plus positioning45-60 mins£60
With raised bed assembly2-3 hrs£110-£160

Based on £60 minimum (first hour) + £50/hr after.


Perfect For...

Seed starting - Protected environment

Hardening off - Transition plants outdoors

Raised beds - Sit on top for complete setup

Year-round growing - Salads through winter

Why Choose Us for Cold frame assembly in Exeter?

Glazing panels fitted securely - no rattling

Hinged lids adjusted for easy opening

Positioned for best sun exposure

Base levelled for proper drainage

What to Expect

Step 1: Check & Position

Glazing panels checked for damage, positioning options discussed, ground assessed.

Step 2: Assemble

Base frame built first, glazing panels fitted securely, lid and hinges attached.

Step 3: Adjust & Demonstrate

Prop mechanism adjusted, lid operation demonstrated, ventilation explained.

🔧 DIY Tips

Building it yourself? Here's what matters:

🔧 Tools you'll need

  • Phillips screwdriver
  • Allen keys (often supplied)
  • Spirit level
  • Gloves (for handling glass)

📐 Key steps

  1. Check all glazing for damage first
  2. Build base frame on level ground
  3. Fit glazing panels securely
  4. Adjust hinges so lid sits square
  5. Set prop stays to hold lid open
  6. Position for best sun

⚠️ Common mistakes

  • Glazing not seated properly (rattles)
  • Hinges misaligned (lid won't close)
  • Poor positioning (too shady)
  • Not levelling base (water pools inside)

💡 Pro trick: For polycarbonate glazing, check which side should face outward - there's usually a UV-treated side. Twin-wall types need their ends sealed or moisture gets in and causes algae growth.

Rather leave it to a pro? No problem - that's what I'm here for. Give me a call.

Good to Know

🌿 Combine with other jobs - At 30-60 minutes, add raised bed assembly, greenhouse setup, or general garden tasks.

Using your cold frame:

  • Ventilate daily in sunny weather (overheating kills plants)
  • Close by mid-afternoon to retain warmth
  • Water in morning so foliage dries before night
  • Add fleece in hard frosts

Seasonal use:

  • Spring: starting seeds, hardening off
  • Summer: melons, peppers in warmth
  • Autumn: extending salad crops
  • Winter: overwintering tender plants

Frequently Asked Questions

Where's the best place to put a cold frame?

South-facing gets most sun. Against a wall is ideal - stores heat and provides wind protection. Avoid areas that flood or pool water.

Do cold frames need anchoring?

Lightweight aluminium frames can blow around when empty. If exposed, I can secure with ground pegs or position against a wall.

Can you assemble on a raised bed?

Yes - this is a great combination. Cold frame sits on top of the raised bed. I'll make sure it's seated properly and the lid works at the raised height.

What if glazing is cracked?

I'll check all panels before assembly. Cracked glass should be claimed from supplier rather than fitted - it'll only get worse.

Get a Free Quote in Exeter

Call us today for a free, no-obligation quote for your cold frame assembly job in Exeter.

01392 964094Request Online Quote

Our Rates

Minimum charge£60
Includes callout + first hour
Additional time£50/hr
This Job£60

Got multiple jobs?

Make the most of your first hour - I can often tackle several small tasks in one visit. List everything you need done when you call!

Why Trust Us

Fully Insured
Local Exeter Business
30 Mile Coverage
No Hidden Costs

Need Cold frame assembly in Exeter?

Get a free quote for your cold frame assembly job in Exeter today.