Summerhouse assembly in Exeter

Professional summerhouse assembly services in Exeter and surrounding areas. Local, reliable handyman - no job too small.

Price Guide

Quote

Typical Duration

Day+

Location

Exeter, Devon

Professional summerhouse assembly - panels fitted squarely, roof weathertight, windows and doors working properly. Garden retreats assembled to be enjoyed, not wrestled with.

Your Garden Escape

Summerhouses are garden retreats - reading rooms, art studios, home offices, peaceful escapes from the main house. They're more refined than sheds, with proper windows and the expectation of comfort.

🏡 Get it right. You'll be spending time in there. Every door must open smoothly, every window must seal properly.


Why Summerhouses Need Care

✅ Done Right❌ Common Problems
Built perfectly squareDoors don't close
Windows seal properlyDrafts and leaks
Roof weathertightWater damage inside
Interior finishedVisible poor workmanship

What You Get

🔧 Full Assembly

StageWhat Happens
BaseChecked level and solid
FloorBearers and boards laid
WallsErected square
GlazingWindows and doors fitted
RoofPanels and felt/shingles
FinishTrims and adjustments

📦 Summerhouse Types

  • Traditional summerhouses
  • Log cabins
  • Contemporary designs
  • Corner summerhouses
  • With verandas

Pricing Guide

SizeEstimated TimeYou'll Pay
Standard summerhouseFull dayQuote
Large/complex2 daysQuote
With veranda1.5-2 daysQuote

Summerhouses vary significantly - I'll quote based on your specific model.


Perfect For...

Garden retreats - Peaceful escapes

Home offices - Work from the garden

Art studios - Creative space

Entertainment rooms - Summer gatherings

Why Choose Us for Summerhouse assembly in Exeter?

Built square so doors and windows work properly

Roof weathertight with correct felt or shingle application

All glazing secure and sealed

Ready to furnish and enjoy

What to Expect

Step 1: Base Check

Base inspected for level, all panels checked present, weather suitable, multi-day planning if needed.

Step 2: Build

Floor constructed, walls erected square, windows and doors fitted, roof completed with proper weatherproofing.

Step 3: Complete

All mechanisms tested, glazing sealed, interior trims fitted, treatment advice given, packaging cleared.

🔧 DIY Tips

Building it yourself? Here's what matters:

🔧 Tools you'll need

  • Cordless drill
  • Spirit level (long)
  • Step ladder
  • Rubber mallet
  • Sealant gun

📐 Key steps

  1. Base MUST be perfectly level
  2. First wall panel sets everything
  3. Don't tighten until checking square
  4. Windows and doors need adjustment time
  5. Roof felt overlaps go DOWN slope

⚠️ Common mistakes

  • Building on unlevel base
  • Rushing the glazing
  • Felt overlaps wrong direction
  • Skipping sealing around windows

💡 Pro trick: Fit windows and doors before roof if possible - it's much easier to adjust when you can see what you're doing. Getting them square is critical.

Rather leave it to a pro? No problem - that's what I'm here for. Give me a call.

Good to Know

🏗️ Base first, always - the base must be complete and level before I arrive. Without a proper base, the summerhouse won't be square and problems will develop. Base preparation is separate work.

Treatment:

  • Many arrive untreated
  • Devon weather is harsh
  • Spirit-based preserver needed
  • Annual treatment after that

Power:

  • Electrical work is separate (qualified electrician)
  • Plan cable routes during assembly
  • Easier to consider before completion

Frequently Asked Questions

What's the difference between a summerhouse and a shed?

Summerhouses are designed for spending time in - more windows, better construction, often insulated. Tongue-and-groove or log construction rather than overlap. Assembly takes more care and more time.

Do summerhouses need planning permission?

Usually not under permitted development if under 2.5m to eaves, more than 2m from boundaries, less than 50% garden coverage. Conservation areas have stricter rules. Check with Exeter Council before ordering.

How long does summerhouse assembly take?

Full day minimum for standard sizes. Larger models or those with verandas take two days. Weather dependent - especially for roofing.

Do I need a base first?

Absolutely. Level, solid base - paving slabs, concrete, or pressure-treated timber. Without a proper base, the building won't be square and problems will develop.

Get a Free Quote in Exeter

Call us today for a free, no-obligation quote for your summerhouse assembly job in Exeter.

01392 964094Request Online Quote

Our Rates

Minimum charge£60
Includes callout + first hour
Additional time£50/hr
This JobQuote

Got multiple jobs?

Make the most of your first hour - I can often tackle several small tasks in one visit. List everything you need done when you call!

Why Trust Us

Fully Insured
Local Exeter Business
30 Mile Coverage
No Hidden Costs

Need Summerhouse assembly in Exeter?

Get a free quote for your summerhouse assembly job in Exeter today.