Summerhouse assembly in Exeter
Professional summerhouse assembly services in Exeter and surrounding areas. Local, reliable handyman - no job too small.
Price Guide
Quote
Typical Duration
Day+
Location
Exeter, Devon
Professional summerhouse assembly - panels fitted squarely, roof weathertight, windows and doors working properly. Garden retreats assembled to be enjoyed, not wrestled with.
Your Garden Escape
Summerhouses are garden retreats - reading rooms, art studios, home offices, peaceful escapes from the main house. They're more refined than sheds, with proper windows and the expectation of comfort.
🏡 Get it right. You'll be spending time in there. Every door must open smoothly, every window must seal properly.
Why Summerhouses Need Care
| ✅ Done Right | ❌ Common Problems |
|---|---|
| Built perfectly square | Doors don't close |
| Windows seal properly | Drafts and leaks |
| Roof weathertight | Water damage inside |
| Interior finished | Visible poor workmanship |
What You Get
🔧 Full Assembly
| Stage | What Happens |
|---|---|
| Base | Checked level and solid |
| Floor | Bearers and boards laid |
| Walls | Erected square |
| Glazing | Windows and doors fitted |
| Roof | Panels and felt/shingles |
| Finish | Trims and adjustments |
📦 Summerhouse Types
- Traditional summerhouses
- Log cabins
- Contemporary designs
- Corner summerhouses
- With verandas
Pricing Guide
| Size | Estimated Time | You'll Pay |
|---|---|---|
| Standard summerhouse | Full day | Quote |
| Large/complex | 2 days | Quote |
| With veranda | 1.5-2 days | Quote |
Summerhouses vary significantly - I'll quote based on your specific model.
Perfect For...
✅ Garden retreats - Peaceful escapes
✅ Home offices - Work from the garden
✅ Art studios - Creative space
✅ Entertainment rooms - Summer gatherings
Why Choose Us for Summerhouse assembly in Exeter?
Built square so doors and windows work properly
Roof weathertight with correct felt or shingle application
All glazing secure and sealed
Ready to furnish and enjoy
What to Expect
Step 1: Base Check
Base inspected for level, all panels checked present, weather suitable, multi-day planning if needed.
Step 2: Build
Floor constructed, walls erected square, windows and doors fitted, roof completed with proper weatherproofing.
Step 3: Complete
All mechanisms tested, glazing sealed, interior trims fitted, treatment advice given, packaging cleared.
🔧 DIY Tips
Building it yourself? Here's what matters:
🔧 Tools you'll need
- Cordless drill
- Spirit level (long)
- Step ladder
- Rubber mallet
- Sealant gun
📐 Key steps
- Base MUST be perfectly level
- First wall panel sets everything
- Don't tighten until checking square
- Windows and doors need adjustment time
- Roof felt overlaps go DOWN slope
⚠️ Common mistakes
- Building on unlevel base
- Rushing the glazing
- Felt overlaps wrong direction
- Skipping sealing around windows
💡 Pro trick: Fit windows and doors before roof if possible - it's much easier to adjust when you can see what you're doing. Getting them square is critical.
Rather leave it to a pro? No problem - that's what I'm here for. Give me a call.
Good to Know
🏗️ Base first, always - the base must be complete and level before I arrive. Without a proper base, the summerhouse won't be square and problems will develop. Base preparation is separate work.
Treatment:
- Many arrive untreated
- Devon weather is harsh
- Spirit-based preserver needed
- Annual treatment after that
Power:
- Electrical work is separate (qualified electrician)
- Plan cable routes during assembly
- Easier to consider before completion
Frequently Asked Questions
What's the difference between a summerhouse and a shed?
Summerhouses are designed for spending time in - more windows, better construction, often insulated. Tongue-and-groove or log construction rather than overlap. Assembly takes more care and more time.
Do summerhouses need planning permission?
Usually not under permitted development if under 2.5m to eaves, more than 2m from boundaries, less than 50% garden coverage. Conservation areas have stricter rules. Check with Exeter Council before ordering.
How long does summerhouse assembly take?
Full day minimum for standard sizes. Larger models or those with verandas take two days. Weather dependent - especially for roofing.
Do I need a base first?
Absolutely. Level, solid base - paving slabs, concrete, or pressure-treated timber. Without a proper base, the building won't be square and problems will develop.
Summerhouse assembly Also Available In:
Get a Free Quote in Exeter
Call us today for a free, no-obligation quote for your summerhouse assembly job in Exeter.
01392 964094Request Online QuoteOur Rates
Got multiple jobs?
Make the most of your first hour - I can often tackle several small tasks in one visit. List everything you need done when you call!
Why Trust Us
Need Summerhouse assembly in Exeter?
Get a free quote for your summerhouse assembly job in Exeter today.